Our projects

Below is an overview of our finished projects, ongoing projects and future projects.

Finished projects

Carrying out works on the construction of the primary sewage network

Insertion of steel pipes using the GRUNDORAM method with a diameter of DN 1000 mm under the railway for the purpose of carrying out works on the project “Performance of works on the construction of the primary sewerage network in the area of Safeta Zajka and Kurt Schorka streets through the Bačići and Donje Telalovo polje business zones” – Municipality of Novi Grad Sarajevo. The length of the embossing is 2 x 12 m. Works performed in July 2021.

Insertion of steel pipes using the GRUNDORAM method

Execution of works on the pressing of steel pipes using the GRUNDORAM method with a diameter of DN 200 mm under the main road for the purposes of execution of works on the connection of the Hifa Oil facility to the communal infrastructure in Kurta Schorka Street – Municipality of Ilidža.

Construction of the water supply network in the Lepenica settlement - Tešanj Municipality

Execution of works on the project “Construction of the water supply network in the settlement of Lepenica – Municipality of Tešanj”. The works included the construction of a distribution pipeline with a length of 2.6 km and a reservoir with a volume of V = 2 x 100 m³ with a hydrostation for increasing the pressure. Period of works: December 2020 – May 2021.

Send an inquiry

Ted Invest